in the production model which have delayed its approval as an
operational item.

Every effort is being made to resolve the

troubles as rapidly as possible.

A special team of about 65 per-

sons at the Sandia Corporation is devoting full time to analyzing

the difficulties in the fuze, and the manufacturer is assisting in
the effort.

In addition, a number of the fuzes has been turned

over the the Armed Forces for independent study and analysis at
each of the three service laboratories

Laboratory,

- the Army's Evans Signal

the Naval Research Laboratory, and the Air Force's.

Wright Air Development Center.

Plant Facilities=/
13. Construction work at the Pantex Ordnance Plant (Project
ORANGE)
June,

near Amarillo,

1952.

Texas,

Follewing a

is scheduled to be completed in

shakedown period,

scheduled to begin in September,

full production is

1952. J

14, The expanded H.E. facilities at the Iowa Ordnance Plant
(Project SUGAR) are scheduled to be completed in April, 1952, and
this will about double the capacity of the portion of this plant
used

for AEC work,

15. By mid-1953 further capacity for high explosives produc-

tion and non-nuclear assembly work will be required in addition
to that being provided at the Iowa Ordnance and Pantex plants
because of increased military requirements for non-nuclear
assemblies of several models.

The extent and proposed location -

of the expanded capacity is presently under consideration,

1/See Appendix "B" of
ules,

in report for construction progress sched-