PAGE 2 RHWNEAAG@3@ UNCLAS
PHASE 4 SAMPLING SOILS ON NORTHERN HALF OF YVONNE BEGINS WITH
INDOCTRINATION AND TRAINING, ON 31 JANUARY PRACTICE SUIT UP
WITH BACKHOE OPERATOR. PHOTOS TAKEN OF THESE PRACTICE OPERATIONS
WITH A MOCK UP OF DIGGING A PIT ON FRED. TwO BACKHOE OPERATORS
AND TwO BACKHOES AARE AVAILABLE FROM SANTEC.
THE RADIO OPERATOR/TECH. LEFT ON THE MAC FLIGHT THE AFTERNOON
OF 31 JANUARY. COMMUNICATIONS SYSTEMS, BOTH THE PRIMARY AND
BACKUP, WENT OUT ON THE MORNING OF 1 FEBRUARY. WE HAVE HAD
ONLY THE HAM AND SATELLITE SYSTEMS OPERATIONAL SINCE THAT TIME.
ON 1 FEBRUARY THE TEAMS STAKED OUT THE ARRAY FOR A 16° X 18°
FIDDLER SURVEY FOR HOT SPOTS IN THE QUINCE AREA TO EXTEND ABOUT
60° EACH SIDE OF QUINCE GZ.
ON 2FEBRUARY THE FIDDLER SURVEY WAS CONDUCTED. THE SOIL SAMPLES
aT EACH OF THE TWO TLD LOCATIONS ON SOUTH YVONNE WERE COLLECTED.
ON 3 FEBRUARY THE TEAM LOCATED AND MARKED THE SOIL PIT LOCATIONS
STARTING JUST NORTH OF THE BUNKER/TOWER AND EXTENDING THROUGH
THE QUINCE GZ AREA.
ON 4 FEBRUARY THE TEAM CONSTRUCTED THE DECON SHOWER FACILITY AND
THE HOT LINE THAT IS TO CONTROL ENTRY AND EXIT FROM NORTH YVONNE.
TwO ADDITIONAL H P°S ARRIVED THIS DATE, LYNCH AND MYERS, PLUS THE

he
a

JO011 18

Select target paragraph3