44

Post-Test Work at USNKDL
4e4el

Post-Test Experimental Work
None,

4e4ee

Data Reduction

The data obtained from the gamma recording instruments
will be reduced by Project 6.4f, Some of these data will be reduced
at test site,

443 ReportWriting
Report information will be kept current by means of tabs
to this annex, Preliminary report will be written in field from this
information, Final report will be written upon return to USNRDL to fit
schedule Laid down by Project Officer,

4.5

Equipment Recuirements
These requirements consist of equipment necessary to decontaminate

the aircraft on Enivetok Island and tools required to maintain and repair
_the equipment and aircraft, (See Tab C-12 for a detailed list.)

4.

Instrument Requirements

4.6,1 Three fixed gamma four=-pi ionization chambers and
continuous recorders will be installed by 6.4f on board gachship. (See

Tab C-l for details of location.)

Sh ROU PE AG

4.6.2 Survey instrument and directional probe requirements are
given in Tab C-13,
4.7

Supvortinge Services Required at Site

4e7el

Office and Storage Space
See Tab Cxld,

4:7.2

Shop Facilities_and Work Areas
See Tab C14,