44 Post-Test Work at USNKDL 4e4el Post-Test Experimental Work None, 4e4ee Data Reduction The data obtained from the gamma recording instruments will be reduced by Project 6.4f, Some of these data will be reduced at test site, 443 ReportWriting Report information will be kept current by means of tabs to this annex, Preliminary report will be written in field from this information, Final report will be written upon return to USNRDL to fit schedule Laid down by Project Officer, 4.5 Equipment Recuirements These requirements consist of equipment necessary to decontaminate the aircraft on Enivetok Island and tools required to maintain and repair _the equipment and aircraft, (See Tab C-12 for a detailed list.) 4. Instrument Requirements 4.6,1 Three fixed gamma four=-pi ionization chambers and continuous recorders will be installed by 6.4f on board gachship. (See Tab C-l for details of location.) Sh ROU PE AG 4.6.2 Survey instrument and directional probe requirements are given in Tab C-13, 4.7 Supvortinge Services Required at Site 4e7el Office and Storage Space See Tab Cxld, 4:7.2 Shop Facilities_and Work Areas See Tab C14,