constitute hazards.

5.4.3 The responsible officer will be advised regarding
personnel requirements (Team D) and schedule for tho forthcoming shot,

5.5

Roll-Up Schedule (Sce basic plan cnd Tab B-15 for schodule)
5.5.1

Industrie] Decontamination of Test Shins
The need for and scope of such industrinl decon-

tamination ce mey be required for tho return of the ships to the
continentecl United Stetes will be detcrmincdd,

It will clso bo dow

cided if the conduct of this vork at the test sitc is feasible, or if
‘the vessels must be moved to a shipyard,
5.5.2

Ss

When all decontamination is complcted, the equipment

and tools will be cleaned and repsirod ns necessery, and packed for
shipment. Surplus materials and supplics vill be assembled and packed.
525.3 All records and classified materiel will be processod
through the proper channels and preparod for transmittel to USNRDL,

£.6

Communic-tion and Timing Links
5.6.1 Gonorel requirements samc cs in basic plan,
5.6.2

5.7

Additionnl facilities vill be supplicd by 6.4b.

Report Schedule
5.7.1

A proliminary report will be issued et the test site,

ST. LGUIS FRC
5.7.2 Tho final report will be prepared at USNRDL, with
completion in accordance with the Project Officer's schedule,