constitute hazards. 5.4.3 The responsible officer will be advised regarding personnel requirements (Team D) and schedule for tho forthcoming shot, 5.5 Roll-Up Schedule (Sce basic plan cnd Tab B-15 for schodule) 5.5.1 Industrie] Decontamination of Test Shins The need for and scope of such industrinl decon- tamination ce mey be required for tho return of the ships to the continentecl United Stetes will be detcrmincdd, It will clso bo dow cided if the conduct of this vork at the test sitc is feasible, or if ‘the vessels must be moved to a shipyard, 5.5.2 Ss When all decontamination is complcted, the equipment and tools will be cleaned and repsirod ns necessery, and packed for shipment. Surplus materials and supplics vill be assembled and packed. 525.3 All records and classified materiel will be processod through the proper channels and preparod for transmittel to USNRDL, £.6 Communic-tion and Timing Links 5.6.1 Gonorel requirements samc cs in basic plan, 5.6.2 5.7 Additionnl facilities vill be supplicd by 6.4b. Report Schedule 5.7.1 A proliminary report will be issued et the test site, ST. LGUIS FRC 5.7.2 Tho final report will be prepared at USNRDL, with completion in accordance with the Project Officer's schedule, 10