permancntly assigned to decontrmination studics, will be trained in the use end operation of decontamination equipment and in doecontaminetion techniques, work schedules permitting. 4e3 Post-Tost Work on Transit ABLE and Transit BAKER 40301 Industrie) Docontamination The possible need for industrial.decontaminetion of one or both ships before, cnd the continuation of such work efter, their return to the continontal United States, is recognized, Tho scope of such work and the logistics involved cennot be ascertained until final tecticrl decontamination in the field has been completad. Sce Tab B-6, 43-2 Roli-t Sec Section 5.5, 4.4 Post Tust Work at NRDL 4421 Post-Tost Experimental Work None, 4e4e2 Proparetion of Report Data and information will be compiled and currently maintained by means of tabs to this Annex, A preliminary report will be prepared at the test site. The final report will be written following return to USNRDL and will comply with the schedule published by the Project Officer, 4.5 Equipment Requirements These constitute the equipment, supplies, and materials which will be required for the decontamination of both ships, Tools for the maintenance and repair of equipment are included. Detailed lists are given in Tab B-7, 4.6 Instrument Requirements 4.6.1 Gamma detection instruments with continuous recorders, as installed in fixed locations on both ships by 6.4f, for location details, 4.6.2 ST. See Tab B-8 LOUIS FEC Survey instrument and directional gamma probe needs 4, 53