permancntly assigned to decontrmination studics, will be trained in the
use end operation of decontamination equipment and in doecontaminetion

techniques, work schedules permitting.
4e3

Post-Tost Work on Transit ABLE and Transit BAKER
40301

Industrie) Docontamination

The possible need for industrial.decontaminetion of
one or both ships before, cnd the continuation of such work efter, their
return to the continontal United States, is recognized, Tho scope of such
work and the logistics involved cennot be ascertained until final tecticrl
decontamination in the field has been completad. Sce Tab B-6,
43-2

Roli-t

Sec Section 5.5,

4.4

Post Tust Work at NRDL
4421

Post-Tost Experimental Work
None,

4e4e2

Proparetion of Report

Data and information will be compiled and currently
maintained by means of tabs to this Annex, A preliminary report will
be prepared at the test site. The final report will be written following return to USNRDL and will comply with the schedule published by the
Project Officer,
4.5

Equipment Requirements
These constitute the equipment, supplies, and materials

which will be required for the decontamination of both ships, Tools
for the maintenance and repair of equipment are included. Detailed
lists are given in Tab B-7,
4.6

Instrument Requirements
4.6.1

Gamma detection instruments with continuous recorders,

as installed in fixed locations on both ships by 6.4f,
for location details,
4.6.2

ST.

See Tab B-8

LOUIS FEC

Survey instrument and directional gamma probe needs

4,

53