1.

Generel Situation
1.1

General

Same as in basic plan.
1.2

Neture and Scope of Test

This test is designed to provide velid informrtion on the
comperative effectiveness of varioud decontamination procedures in

the removal of radioactive contaminetion from ship's veather surfcces
end interior spaces, Transit ABLE, with washdown, will have residucl
conteminetion, end Transit BAKER, “ithout washdown, “ill heve original
conteminetion, Measurements will be madc to dctcrminc the cxtont
and @istribution of thc conteminent, the comparative effcoctivenesses
of the decontsmination procedures, and the relative effectivencsses

of tho individual methods constituting the procedures,
will be rocorded,
1.3

11 results

Purpose of Annex
1.3.1

To statc and describe the objectives, cxpcrimentel

end non-exporimentcl, of Project (Problom) 6,4b.

1.3.2 To describe in dctail the plen of rttsck on Project

(Problem) 6.4b.

1.3.3

To provide detailed information on the opcrrtional

ond logistical roquirements of Project (Problom) 6.4b.

1.4

Enomy Forces (Shot Schedulc)
1.4.1

1.5

Same as in basic plan,

Friondly Forecs
1.5.1

Same as in basic plan,

1.5.2

Team B will be as shown in Tesk Organization.
ST. LOUIS ER

1.5.3 Team C will be supplicd fron thocomplenth s of
Y¥i.G 39 and YiG 40 on permancnt assignment, Team D vill be supplicd

by the Task Foree in four cqual groups; one group for ecch shot vith
a fourth group in roserve for emergency roplncemonts (refcr to

Tab B~10),

No particular ratings cro required.

-1o- Jy

Vf

Select target paragraph3