4.7.6

Special Services
None foreseen,

4.8

lanpover kequiremonts

Seo Tab 4-21 for details.
4.9

Shipping and Tronsportation Requirements
Seo Tab A-19 for details.

4.10. Costs
See Tab A-20 for details,

5.

Commend and Communication Matters (Test Operation)
General operational matters are given in the basic plan,

5.1

Pre-Shot Preparation (see Tab A-22 for details)
The washdomm system will be testcd and elterod if necesscry.

Equipment and instruments will be checked,
of operations.

5.2

There will be e rchocrsal

Shot Test Schedule (see Tab A-21 for details)

A sequential description of operations, the number of personnel
and the time required for individual jobs are included, The final
scheduling will be done by the coordinating group.

5.3

Between-Shot Preparations (see Tab A-22 and Tab A-21)
These will be essentially the same as the pre-shot preparations,

5.4

Roll-up

ST, LOUIS

See Tab A-23 for details,

5.5

Communications and Timing Links
Same as in basic plan,

10

"y

except that rehearsals may not be needed,

FRC

Select target paragraph3