4.7.6 Special Services None foreseen, 4.8 lanpover kequiremonts Seo Tab 4-21 for details. 4.9 Shipping and Tronsportation Requirements Seo Tab A-19 for details. 4.10. Costs See Tab A-20 for details, 5. Commend and Communication Matters (Test Operation) General operational matters are given in the basic plan, 5.1 Pre-Shot Preparation (see Tab A-22 for details) The washdomm system will be testcd and elterod if necesscry. Equipment and instruments will be checked, of operations. 5.2 There will be e rchocrsal Shot Test Schedule (see Tab A-21 for details) A sequential description of operations, the number of personnel and the time required for individual jobs are included, The final scheduling will be done by the coordinating group. 5.3 Between-Shot Preparations (see Tab A-22 and Tab A-21) These will be essentially the same as the pre-shot preparations, 5.4 Roll-up ST, LOUIS See Tab A-23 for details, 5.5 Communications and Timing Links Same as in basic plan, 10 "y except that rehearsals may not be needed, FRC