et
4.4.3 Reports
Report information will be kept current by means
of trbs to this annex, A preliminary report will be written in the
field, The final report will be written upon return to USNEDL,
4.5

Equipment Requirements (see Tab A~-17 for details)
Tools end materials needed for alterations and maintenance

of the washdowm system will be incorporated into the Ships Allowance

List,

:

4.6

Instrument Requirements (see Tab A-18 for details)

4e6.1

Recording

Fixed Gamma Radiation Detection Stetions

(See Tab &=-3, Tab A-8)

4.6.2 Recording Waterflow Meters (see Tab A+2)
4e6.3
4.7

Recording

Anemometers end Windyanes

(See Teb hell)

Supporting

Services Required atSite

(See Tab 4-19 for dotails)

4.7.1

Office end Storage Space
Desk and file cabinct spaco is only shore requirc=-

nent

4.7.2

Shop Facilisics end WorkAreas
Plan to use shop on Transit ABLE.

4.7.3

Utilitics
No shore requirements foreseen,

4.7.4

Irensportation

Ship to ship, ship to shore, end shore trensportation
for personnel and equipment as necded,

4.7.5 Photography

ST, LOUIS FRC

Equipment and washdowm systom layout cnd action

photographs are required.

¥2

Select target paragraph3