4.6.9 Miscollancous Information from othcr Programs See Tab E~16. 4.7 Manpower Requirements .7e1 Pre-test Statesids Sec Tab E-17. 4.7.2 On-site Technical See Tab E-17. 4.7.3 On-site Military Sce Tab E-17. 4.7.4 FPost-test Stateside See Tab E-17. 4.8 Shipping and Transportation 4.8.1 Shipment to Site All instruments and cquipment associated «ith program 6.le will be shipped to the sitc aboard ABLE and BAKER, with most of the equipment on BAKER in proportion to the number of instruments thereon, 4.8.2 Personnel to and from Site Part of the personnel will accompany the transits to the sitc, and the remainder will go by air. All personnel vill rcturn by air. Sec Tab E-17 for details. 4.8.3 Active Sample Air Shipment See schcdule in Tab E-18, 4.8.4 Rollup Shipment ST. LQUIS FRC All equipment othcr than active samples previously shipped by air vill return on ABLS and BAKER. L.9 Costs Sec Tab E-19, 9 2 19