in the ship's allowance. As these items are compilicd or anticipated they will be ineludcd in Tab E-12. 4.5 Instrument Requirements See Tab E-12 for list of instruments, given in Tab E-13. .6 Survey rcquirements are Supporting Services Required 4.6.1 Lab and Shop Facilitics One workshop has been provided aboard each ship for maintenance and repair operations. One shop exists aboard TRANSIT BAKER and a machine shop will be available at Parry Island if the shipboard installation is inadequatc. Storage space will be necessary at Eniwetok Island for sample return boxes, 4.6.2 Power Requirements Power will be required for most of the instruments during the test. Sec Tab E-12 for list of power rcquirements per unit. In addition, lights will be required for all the test compartments and the fircrooms during recovery, decontamination, survey and maintenance operations. 4.6.3 Billets Sec basic plan. (sce continuation sheet) 4.6.4 Radiological Surveys See Tab E-13. h.6.5 Project 2.62 Analyses at USNRDL See paragraph h.3.1. h.6.6 Miscellancous Requirements from the Task Force Sec Tab E-1l). 4.6.7 Decontamination ST, LOUIS FRC See Annex C. 4.6.8 Gamma Time Intcnsity Results Sce Tab E-15 and Annex F. 8 aes 99