in the ship's allowance.

As these items are compilicd or anticipated

they will be ineludcd in Tab E-12.

4.5

Instrument Requirements

See Tab E-12 for list of instruments,
given in Tab E-13.

.6

Survey rcquirements are

Supporting Services Required
4.6.1

Lab and Shop Facilitics

One workshop has been provided aboard each ship for maintenance and repair operations. One shop exists aboard TRANSIT BAKER and
a machine shop will be available at Parry Island if the shipboard
installation is inadequatc. Storage space will be necessary at Eniwetok
Island for sample return boxes,

4.6.2

Power Requirements
Power will be required for most of the instruments during

the test. Sec Tab E-12 for list of power rcquirements per unit. In
addition, lights will be required for all the test compartments and the
fircrooms during recovery, decontamination, survey and maintenance
operations.

4.6.3 Billets
Sec basic plan.

(sce continuation sheet)
4.6.4

Radiological Surveys
See Tab E-13.

h.6.5

Project 2.62 Analyses at USNRDL
See paragraph h.3.1.

h.6.6

Miscellancous Requirements from the Task Force
Sec Tab E-1l).

4.6.7

Decontamination

ST, LOUIS FRC

See Annex C.

4.6.8

Gamma Time Intcnsity Results
Sce Tab E-15 and Annex F.