ANNEX E
Interior Contamination Annex

Task Organization
Group Leader ~- N. R. Wallace

Team A — Data and Sample Retrieving ~ 99 men from Task
Force

- 6-10 men from Project

6.4 test ships

Team B - Radiological Survey - See Annex D
Team C - Decontamination - See Annex C

Team D - Test Setup - 5 men (USNRDL)

N. R. Wallace
F. K. Kawahara
J. CG. Sherwin

J. V. Zaccor
H. B, Johnston

R. E. Rexroad (ACC) loan from
Project 6.5

1, General Situation
1.1

General
Same as in basic plan.

1.2

Nature and Scope of Test

Measurements will be made within below-deck and top—side compartments of the test ships to provide information relative to the personnel
hazard created inside the ship by the intake of contaminated air through
boiler-air and ventilation systems. An attempt will be made to evaluate
the protection afforded by several devices installed in, or by special '
operation of, ventilation air systems. The work will be done primarily
on TRANSIT BAKER.
1.3

Purpose of Annex

1.3.1

ST. LOUIS FRC

To describe in detail the experimental objectives and

plan of attack on Project 6.he.

CVG YGLS- Cow)197

SOT yc
fad 2-@205-35~

°

eC- S78-

WW)

Select target paragraph3