LIST OF TABS
ANNEX "Dp"

Tab
No,

Paragraph
Reference

Tab Contents

Del

3.2, 5.1

Radiological survey station markings’

D=-2

3.2.1

Radiological surveys for Washdown

D-3

3.2.2

Radiological surveys for Ship Decon

D-4

3.2035 5632363

Rediological surveys for Aircraft

D~5

32d

Radiological surveys for the Interior

D6

3.2065

Radiological surveys for the shielding
Studies Group 6.4h

D-7

3.2.6, 5.1.1, 5.3.3.1,
543.363

Consolidation requirements for shipboard radiological surveys

D8

3.2.6

Radiological survey data sheets

D-9

3B, 5hed

Data correction factors for survey

D-10

Bohol, 3.4.62, 4aledy
5ehed

Radiological survey monitor training

D-1i

3.51, 5.1.2

Shipboard camera station layout

D-12

3.562, 3.5.3, 5.3.1,

Shipboard camera station instruction

5030302, 5ehed

D-13

4.11

D-14

4.1.2

Group 6.4a
Group 6.4b

Studies Group 6.4c

Contamination Group 6.46

instruments

for operating, recovering film and

securing camera station after shots
Evaluation and testing of the

directional beta probe at USNRDL
Laboratory tests to establish the
reliability of measuring beta

radiation in the field

D-15

holed

ST, LOUIS FRC

Technical photography development
tests

cy

Select target paragraph3