proper operation,

The target will be cleaned and adjusted if necessary,

end off at H + 4,

(Seco Tab D-12 for operating details.)

The timor clock will be set to turn the camcra and lights on at H hour

5302

5.3.3

erations Bety

H and R

5.3e2el

Make finel check on all instruments,

5.322.2

Organize survey toams and continue training,

eration

er

R-H

(See Tab D-25 for schedule)

523.301 The first radiological survey will be initiatod

aboerd Transits ABLE and BAKER in accordance with Tab D-7,

543.302 At about R +1, one man will heve the task of

recovering the film end securing tho camera station on Transit BAKER,

(See Tab D-12 for rocovery and securing dctails.)

5.32323 Required radiological surveys for the aircraft

Studies Group, 6.4c, will be initiated as outlined in Tabs D-4 and D-7,

5.4

Botween-Shot Preparation (Sce Tab D-25 for schedule)

5e4e1 Check condition of markings at Rediologicel Survey Stations
and repaint where necessary.
5.4.2

Check and calibrate all instruments,

5403

Continue treining of monitors (Tab D-10).

5404

Recheck operation of camere station according to Tab D-12,

504.5

Rough deta will be corrected for instrument calibration,

docay and other factors, (Sec Tab D-9 for details.)

5.5

Roll-up Schedule (Sce basic plan end Tab D-25 for schedule)
5e5e1 Packing

ST. LoU!S FRC

Whon all radiological survey operations have been completed,
the instrumcnts, parts and equipment will be packed for shipment, The
camera station will be disassembled after the last shot end the components
packed,