4-9

Shipping end Transportation Requirements
Sea and air shipment requirements for materials, test samples

and personnel to and from test area are shown in Tab D-23,

4.10

Costs
See Tab D-24 for breexdown of budget and record of expenditures,

5.

COMMAND2. COMMUNI CZTIONS MATTERS (Test Operation)
General operational matters are as given in the basic plen,

is shot time,

5.1

K-nour is reboarding time on a particular ship.

H-hour

Pre-Shot Preprration
5 lei

Marking of Radiolozical Survey Stations

Radiological survey stations will be painted on Transits
ABLE and BAKER in accordance with Tabs Del and D-7, Group 6.4c¢ will
mark the radiological survey stations on the aircraft,

5.1.2

Assomblv of Photographic Station
Tho photographic equipment will be instelled and

assembled on Transit BAKER according to Tab Dell,

5.2

Dry Runs and Shot Rehearsels (Soe Tab D-25 for schedule)
5.2.1

Photopravhic Station

The camera station will be operated for four hours under
actual shot lighting conditions, The film will be processed prior to the

first shot and inspected, Any chenges in camera or lamp settings will be
made, and a repeat dry run will be madc,
543

Typical Shot Schedule
5.3.1

Overations Prior to H-Hour

ST, LOutS erC

About H-12,the camora will Le wound and loaded with
film, the lights adjusted end checked, and the timer clock started, The
porthole and prism vill be cleancd of all dust and dirt, The flesh lemp
will be covered with plestic bags, placed in position ond checked for
10

a
ys