special dry-box storage facilities to check and maintain survey instru-~
Tete) components of the camera station, (See Tab D-17 for a detailed
list.
4.6

Instrument Requirements

4.6.1 Required will be gamma survey meters (radiacs),

directional beta probes, directional gamma probes, wipe samplers and

laboretory counting equipment. Spare parts and batteries will be in=cluded for all instruments, Calibration sources will be available
for the directional beta and gamma instruments, (See Tab D-1$ for a

detailed list.)

4.6.2 Components of the camera station on Trensit BAKER will
be required, Required will be a camera, lead shield, prism, lights,
target, timers and film,
4.7

Supporting Services Required at Site
4.7.1

Office and Storaze Space
See Tab D~19,

4.7.2

Shop Facilities and Work Areas

See Tab D-20,
4.7.3

Utilities
See Tab D-21,

AeTol

Ground and Weter Trersportation and Eauipment Movement
See Tab D-2l,

4.7.5 Photography
See Tab D-21,

Special Services

ST. LOUIS “RC
wy

:

4.7.6

See Tab D-2l1,

4.8

Manpower Requirements

See Tab D-22 for personnel lists and schedules,

9
2

fy