special dry-box storage facilities to check and maintain survey instru-~ Tete) components of the camera station, (See Tab D-17 for a detailed list. 4.6 Instrument Requirements 4.6.1 Required will be gamma survey meters (radiacs), directional beta probes, directional gamma probes, wipe samplers and laboretory counting equipment. Spare parts and batteries will be in=cluded for all instruments, Calibration sources will be available for the directional beta and gamma instruments, (See Tab D-1$ for a detailed list.) 4.6.2 Components of the camera station on Trensit BAKER will be required, Required will be a camera, lead shield, prism, lights, target, timers and film, 4.7 Supporting Services Required at Site 4.7.1 Office and Storaze Space See Tab D~19, 4.7.2 Shop Facilities and Work Areas See Tab D-20, 4.7.3 Utilities See Tab D-21, AeTol Ground and Weter Trersportation and Eauipment Movement See Tab D-2l, 4.7.5 Photography See Tab D-21, Special Services ST. LOUIS “RC wy : 4.7.6 See Tab D-2l1, 4.8 Manpower Requirements See Tab D-22 for personnel lists and schedules, 9 2 fy