ey 4.2 Pre-Test Work on Transit ABLE and BAKER nat USNRDL 4e2.1 Installation of Technical Photographic Equipment The lead camera shield and porthole will bo in- stelled on tho main dock of Transit BAKER in the deck houso. Lamp breckcts and an electricel connector will be installed above the porthole, Provisions vill be made for securing the target or beckground bosré to the bulcark opposite the porthole. (Sce Tab D-16 for drawings. 4.2.2 Tosting of Photographic Equipment Aboard Trensit The photographic equipment will be installed end testcd aboerd Transit BAKER undcr sirulated test site conditions. Operational reliability of the apparatus will be checked, The test filn will be processed and inspected for readability. 4.3 Post-Test Work on Transit ABLE end BAKER See roll-up. 4e4 Post=Tost Work at USNRDL 4e4eL Post-Tost Exporimontsl Work None, 44-2 Data Roduction All field data v:i11 be recopied on cleen data shects, Where applicable, instrument calibretion factors will be applied to the deta before delivery to the requesting investigator, 4.4.3 Report Writing Report information 7111 be kept current by means of tabs to this annex, Preliminsry report vill be written in field from this information, Final report will be written upon return to USNRDL to fit schedule laid down by Project Officer, 45 Equipmont Requirenents sp, bovis FRC These reaquirencnts consist: of electrical instruments cnd 8 £3