ey
4.2

Pre-Test Work on Transit ABLE and BAKER nat USNRDL
4e2.1

Installation of Technical Photographic Equipment

The lead camera shield and porthole will bo in-

stelled on tho main dock of Transit BAKER in the deck houso.

Lamp

breckcts and an electricel connector will be installed above the porthole, Provisions vill be made for securing the target or beckground

bosré to the bulcark opposite the porthole. (Sce Tab D-16 for drawings.

4.2.2

Tosting of Photographic Equipment Aboard

Trensit

The photographic equipment will be installed end
testcd aboerd Transit BAKER undcr sirulated test site conditions.
Operational reliability of the apparatus will be checked, The test
filn will be processed and inspected for readability.

4.3

Post-Test Work on Transit ABLE end BAKER
See roll-up.

4e4

Post=Tost Work at USNRDL

4e4eL Post-Tost Exporimontsl Work
None,
44-2

Data Roduction

All field data v:i11 be recopied on cleen data shects,
Where applicable, instrument calibretion factors will be applied to the

deta before delivery to the requesting investigator,
4.4.3

Report Writing

Report information 7111 be kept current by means
of tabs to this annex, Preliminsry report vill be written in field
from this information, Final report will be written upon return to
USNRDL to fit schedule laid down by Project Officer,
45

Equipmont Requirenents

sp, bovis FRC

These reaquirencnts consist: of electrical instruments cnd

8

£3

Select target paragraph3