The camera assembly will be placed inside the deck house on the main
deck and will view a target on or near the bulwark through porthole
in the deck house bulkhead,

The target will be illuminated by a

Heiland electronic flash unit (Stobonar III) synchronized to the

cemera shutter, This lamp will be placed close enough to the target
so that its light will determine the exposure of the film regardless
of ambient light conditions, A timer clock will be used to turn the
camere on at H hour and turn the camora off at H + 4 (480 frames

being exposed).

3.5.2

(See Tab D-1l1 for a layout of equipment.)
Loading and Adjusting Camera end Lights

About H-12,the cemera will be wound and loaded vith
film, the lights adjusted and checked, and the time clock started, The
porthole cnd prism will be cleaned of all dust cnd dirt, The flesh lamp
will be placed in plastic bags, set in position and checked for proper
operating condition. The target will be cleaned and adjusted, if
necessery. The timer clock will be adjusted to turn the camera cnd lights
on ete hour end off at H + 4, (Seo Tab D-12 for details operating equipment.

325.3

Recovery of Film and Securing of Camera Station

At about R +1, one man will borrd the ship, and
secure the camera station, The porthole will be covered and the flash
lamp disconnected and removed from the ship for decontamination and

storage,

As soon as the interior of the ship msy be entered, the

camcra will be unloaded ond the film removed from the ship for processing. (See Tab D-12 for rccovery «nd securing details.)
3.5.4

Processing Films and Roading Results

The exposed end recovered film will be processed
as soon as possible by the Lookout Mountain Laboratories, As soon as
they are processed,the negative films will be previewed with a 16 mm
projector, This will show gross changes in the appearance of the
target as well as suspended large drops or particles, Detailed inspection of the films will be delayed until return te NADL.
4.

ADMINISTRATION AND LOGISTICAL MATTERS (Test Proparction,

Support and Roll-up

Lol

Pre-Test Work ot USNRDL
4el.1

ST, LOUIS FRO

Evalustion of the Portable Beta Probes
A prototype beta probe will be tested to determine the

6

¢/

Select target paragraph3