ry
1.

GENERAL SITUATION
1.1

General

Same as in basic plan.
1.2

Natyre and Scope of Work

To plan, organize and instruct survey parties and conduct
detailed initial radiological surveys on test ships, both above and

below decks,

To obtain such survey data as aro required for various

investigetions being conductod under Project 6.4.

These include

the Washdown Group (6.42), Ship Decontamination Group (6.4b), Aircraft
Studies Group (6.4c), Interior Contamination Group (6.4e), and the

Shielding Studies Group (6.4h).

To photograph the fall-out on Transit

BéKER, To procure, calibrete, store, maintain and issues special
radiological survey instruments for Project 6.4.
1.3

Purpose of fnnex

1.3.1

To describe in detail the support functions and

plan of attack on Project 6.40.

1.3.2 To provide detailed information on the operationel
and logistic requirements of Project 6.40.
1.4

Enemy Forces (Shot Schedule)
Same as in basic plen,

1.5

ExiendlyForces
1.5.1

Same as in basic plan,

1.5.2 Porteble and laboratory type instruments will be
procured from the following sources:

Gamma survey (radiac}instrumoents from USNRDL stock

Diroctional beta and gamme instruments from Instruments Branch, USNRDL
Leboratory counting equipment from USNRDL stock

Additional radiacs (if necessary) from Task Force

Rad Safe or Project 6.4g.
1.5.3

ST, LOUIS FRC

Ten permanently assigned survey enlisted personnel

will be obtained from the 6.4 ships' company.