Ay ANNEX "Cc" LIST OF TABS Tab No, Paragraph Reference Tab Contents Col 3.1, betel, 426 Detailed location and securing plans of C-2 3ely 3.2 Four-pi instrument data-retrieving plan & available data C-3 3.3.1 Shipboard aircraft monitoring plan & C4 343.2 Plan for distribution studies on aircraft C5 3.363, 3.4.6 Material damage inspection plan, and C-6 Behe2s 3403 Decontamination methods end procedures, and available results C+7 Zehehy 2ehe5 Cost of decontamination and observations of CHE 3.5 Doses to decontamination creme, available data C-9 4.1.1 Washdotm system design and evailnable results C~10 4.1.3 Laboratory investigation of cleaning agcnts, history and available results C11 4el4 Modification plan of sircreft for loading and handling C12 4.5 Equipment requirements C-13 40622 Requirements for instruments to be supplicd by Project 6.40 C-14 heTely AcTe2sh4e7e3 Requirements for supporting services C-15 4.8 Manpower requirements C+16 4.9 Shipping and trensportation requirements C-17 4.10 Cost breakdown heTehs Ae7e5yhe706 aircraft and instruments on ABLE & BAKER available results at Eniwetok before manual decontamination and available results available results operational advantages, available results of system tests 14 s7, LOUIS end es 23