Ay

ANNEX "Cc"
LIST OF TABS

Tab
No,

Paragraph
Reference

Tab Contents

Col

3.1, betel, 426

Detailed location and securing plans of

C-2

3ely 3.2

Four-pi instrument data-retrieving plan &
available data

C-3

3.3.1

Shipboard aircraft monitoring plan &

C4

343.2

Plan for distribution studies on aircraft

C5

3.363, 3.4.6

Material damage inspection plan, and

C-6

Behe2s 3403

Decontamination methods end procedures, and
available results

C+7

Zehehy 2ehe5

Cost of decontamination and observations of

CHE

3.5

Doses to decontamination creme, available
data

C-9

4.1.1

Washdotm system design and evailnable results

C~10

4.1.3

Laboratory investigation of cleaning agcnts,
history and available results

C11

4el4

Modification plan of sircreft for loading
and handling

C12

4.5

Equipment requirements

C-13

40622

Requirements for instruments to be supplicd
by Project 6.40

C-14

heTely AcTe2sh4e7e3

Requirements for supporting services

C-15

4.8

Manpower requirements

C+16

4.9

Shipping and trensportation requirements

C-17

4.10

Cost breakdown

heTehs Ae7e5yhe706

aircraft and instruments on ABLE & BAKER

available results

at Eniwetok before manual decontamination
and available results
available results

operational advantages, available results

of system tests

14

s7, LOUIS end

es

23

Select target paragraph3