Transvortation

Four personnel boats and two motor whale boats are avail~
able and will be standing by with coxwains and engineers for transporting
6.4 personnel to and from the beach and Able and Baker. Schedules and
numbers available will be arranged locally.
5.5.4

Operations

MOLALA will initially moor alongside Able and the radiological survey will commence immediately after power is supplied and RadSafe is set upe This will be described in plan in Annex 6.4d. Atthe
completion of this survey, the aircraft (Annex 6.4¢) will be removed,

followed by the panels (Annex 6.4j).

These will be hoisted by the ship's

boom and lowered onto a barge to be supplied by the Task Force.

These

items will be towed ashore and transported to their respective testing
areas. Simultaneous with the initial survey, the records fromthe gamma
recording instruments will be retrieved by 6.4f personnel (Annex 6.4f).
Successive problems leaders will then initiate their work, governed by the

radiological situation and the planning conferences.

For details of the

operations of various problems, see Annexes 4, B, C, D,!, F, G,,H, I and

Je

As soon as the radiation level on Baker is sufficiently low to permit

comiencement of operations on her, she will be moved alongside Able, and

Able «rill commence supplying facilities to Baker. At this time, if it is
radiologically feasible, the RadSefe and Technical Control Points will be

moved onto Able.

5.565

Prevaration for Next Shot
5.56501

Operational Decontamination

Depending upon the initial levels experienced on

the ships, and the effectiveness of the washdown and the tactical de-

contamination operations conducted by Problem 6.4b, an additional thorough
operational decontamination may become necessary. Plans shall be made to
determine the need for this sufficiently before four days prior to shot

time that it may be completed by H minus four days.

5.52502 Readying for Sea

ST. LOVis FRO

At least four days before shot time all problem

personnel shall devote their efforts toward getting their particubr
arrange cents aboard Able and Baker for the next shot completed. The air-

plane and panels in Annexes C and J shall be loaded, all instruments shall

be checked for operational readiness and all other arrangemerts s nall be

checked and completed in order that the Deputy Project Officer can report
to the Froject Officer at least 12 hours before sailing time that the ship
is, for experimental purposes, ready for sea.