regarding special necessary radiological safety precautions such as gas
masks, if an unacceptable inhalation hazard exists. For the high intensity
condition, R-hour will be declared when the general topside intensity
reaches 2.5 rfhre

For the condition of 1000 r/hr at one hour, this will

occur at [i plus 6 days.

5.4.6 Arrival at Eniwetok
Upon arrival at Eniwetok, the ships will moor to the two
buoys assigned. These buoys are approximtely three-quarters of a mile
from the beach and are designated as
.
If R-hour has not been reached on either ship, general operations will
not start, but radiological surveys will be conducted as necessary.
5.5

Operations After R-Hour
5.51

Radiological Safety Arrangements

At or prior to R-hour, arrangements for the radiological
safety of personnel of the various problems will be instituted. It is
presumed that R~hour will be declared first on TRANSIT Able. MOLALA will
moor alongside Able and, if necessary, will supply Able with necessary
electrical power and other services.

At this time, a RadSafe control

point will be set up in MOLALA and the RadSafe change house will be put

into operation on the beach. Personnel having duties aboard Able or
MOLALA will proceed through the change house on the beach and will be
_ outfitted there with protective clothing and dosimetry devices. They will
proceed via small boat to MOLALA and thence to the Technical Control point
on iJOLALA. The Technical Control Point is discussed in paragraph 5-52.

They will then proceed aboard Able and conduct their work. Upon finishing
their work on Able, personnel will board MOLALA and remain in a delineated
zone until monitored.

They will discard bobdties and gloves here, into

containers provided by RadSafe. RadSafe will delineate passageways for
contaninated personnel by disposable rubber matting or other suitable
material, and personnel will follow these paths to the Technical Control

Point.

ST, LOUIS FRC

Upon release from the Technical Control Point, they will
proceed by small boat to the beach and through the change house for
thorough decontamination. Task Force personnel will proceed fromthe

change house to their ships; 6.4 personnel will be released to their
respective duties. As soon as Able is declared safe for continued occupancy, the RadSafe control point and Technical Control Point will be
transferred from MOLALA to Able and the same rules will apply for operations

on Baker.

For details of the RadSafe change house and control point

arrangements, see Annex G.

00862

Re

29