regarding special necessary radiological safety precautions such as gas masks, if an unacceptable inhalation hazard exists. For the high intensity condition, R-hour will be declared when the general topside intensity reaches 2.5 rfhre For the condition of 1000 r/hr at one hour, this will occur at [i plus 6 days. 5.4.6 Arrival at Eniwetok Upon arrival at Eniwetok, the ships will moor to the two buoys assigned. These buoys are approximtely three-quarters of a mile from the beach and are designated as . If R-hour has not been reached on either ship, general operations will not start, but radiological surveys will be conducted as necessary. 5.5 Operations After R-Hour 5.51 Radiological Safety Arrangements At or prior to R-hour, arrangements for the radiological safety of personnel of the various problems will be instituted. It is presumed that R~hour will be declared first on TRANSIT Able. MOLALA will moor alongside Able and, if necessary, will supply Able with necessary electrical power and other services. At this time, a RadSafe control point will be set up in MOLALA and the RadSafe change house will be put into operation on the beach. Personnel having duties aboard Able or MOLALA will proceed through the change house on the beach and will be _ outfitted there with protective clothing and dosimetry devices. They will proceed via small boat to MOLALA and thence to the Technical Control point on iJOLALA. The Technical Control Point is discussed in paragraph 5-52. They will then proceed aboard Able and conduct their work. Upon finishing their work on Able, personnel will board MOLALA and remain in a delineated zone until monitored. They will discard bobdties and gloves here, into containers provided by RadSafe. RadSafe will delineate passageways for contaninated personnel by disposable rubber matting or other suitable material, and personnel will follow these paths to the Technical Control Point. ST, LOUIS FRC Upon release from the Technical Control Point, they will proceed by small boat to the beach and through the change house for thorough decontamination. Task Force personnel will proceed fromthe change house to their ships; 6.4 personnel will be released to their respective duties. As soon as Able is declared safe for continued occupancy, the RadSafe control point and Technical Control Point will be transferred from MOLALA to Able and the same rules will apply for operations on Baker. For details of the RadSafe change house and control point arrangements, see Annex G. 00862 Re 29