recorded by approximately 30 recording devices per ship; various portable geuma survey meters for individual opcrations; (b) Beta measurement - portable beta probes; (c) sirborne contaminant measurement - prototype air-monitoring instrument installed topside on each test ship; air sanplers for assessing contaminated eir in ventilation and boiler-air systems; (a4) Other - dosimetric devices, both fixed and carried by per- sonnel; data reduction devioe; and various laboratory instruments for pretest work. Some of these instruments will be obtained from comercial sources, and some will be fabricated or modified at the Laboratory before departure to the site. At sea trials, instruments will be further checked for operavility and other requirements laid down by the nature of the project. 4e4e05 Support Services Support services are given in detail in the Amexes and Tabs for each sub-project. General support requirements at the test site are as follows: (a) office and storage space for approximately 40 investigators; (b) workshop on each shi; for maintenance and repair of equipment, with shop facilities also available ashore; (c) shore decon- tamination center for panels, aircraft and equipment; (d) shore change house for participating personzel; (e) on-site transportation of personnel aude quipment, ship to ship, ship to shore, and transportation ashore between locations; (f) water and power supply ashore for operation of instruments and equipment; (g) transportation enroute to site, some person- nel and most of the equipment trevelling aboard Able and icker, other personnel travelling by air; (h) air shipwent of radioactive saxples. 4.4.64 Wanpower ST. LOUIS FRC USNRDL technical personnel will number about 39 or 40 investigators, each working about three months, for a total of 117 manmonths, or about 10 man-years. Other agencies are contributing about six to ten personnel directly involved in the test, each workinz about three months, for a tot:1 of 18 to 30 man-months. Approximately 165 naval personnel will comprise the crews of the two drone ships, the control plane, and the fleet tugs, Project 7.3 will contribute 1000 enlisted men for working parties. Total estimated manpower: 50 technical, 165 ship personnel, 1000 workers. Supervision will be given on individual sub-projects by the problem leaders involved. 4.4.5 Costs (Kearns ) 009521