4.3

Roll-up
After the final shot, most of the work will involve data re-

duction, packing of materials and equipment, shipment of samples, and the
writing of the preliminary test report. All records and classified material

will be cleared through the appropriate channels and prepared for trans-

mittal to USIRDL.

Special details of roll-up operations may be required. Regarding
washdown, if after the last shot, surface surveys indicate a pattern of

residual activity, then a detailed check of water coverage by the washdown
system on the test areas will be attempted on Transit Able. Consideration
will also be given to the possible need for industrial decontamination of

one or both ships before, or during, their return to the continental United

States.

The scove of such work and the logistics involved will be ascer-

tained when final tactical decontamination in the field has been completed.
Aviation mcintenance personnel will complete any required maintenance on
the aircraft and prepare them for shipment aboard Able and Baker.

Post-test work at the Laboratory will include data analysis,
samsle analysis, and the writing of the final report.
4.4

Logistics and Support Services
4.4.1

Equipment Required

Detailed lists of equipment required for rroject 6.4 are
given in the Annexes and Tabs of the sub-projects. General information is

as follows:

(a) Decontamination - washdown system; equipment for fire

hesing, hot liquid cleaning, steem cleaning, hand scrubbing, sandblasting,
Tenaant machining, cutting, and flame treating; plates, racks, frames, and

supplementary tools; (b) Other equipment - technical photography equip-

ment such as camera, synchronizer, and film; particle collectors; air

sanplers; personnel protéctionequipment; auxiliary tools and parts;
various laboratory models and equipment for »re-test work.

Some of this equipment will be obtained from commercial

sources, and some will be fabricated or modified at the Laboratory before
departure to the site. All equipment vill be checked for ov. rability ane
other requirements laid down by the nature of the project.
4.4.2

Instruments Required

ST. LOUIS FRC

Detailed lists of instruments required for “roject 6.4 are
given in the Annexes and Tabs of the sub-projects. General information is
as follows:
(a) Gamaa measurement =~ about 140 fixed gaia detection
instruments (gas donization chaaber detectors), installed bota above and

belo: decks on the test shivs:; information fro. these instruments to be