5.1.3 Shot rch ersal op-retions for this project rill be ecrri.d
out cs pert of the JTF rcharsal and also as part of oth r Project 6.4
cxereiscs.

Ectuils of oprretion arc same as pr sent-d in & ction 5.2.

5.2) Typiczl Shot Schodulc

5.2.1 Shot opcrutions prior to h hour will bi.gin two days prior

to the depertur. of dronc ships from Eniwctok for t:st crca,
strippablce coating will be epplied to framcs and backings.

At this timo,

At H mims 2 deys, 6.5 personnel will bocrd Trensits Ablc
and Buker to: (1) chock adcquecy of tost pencl mount fest-nings, (2) check

puncls and coatings, retouching where necded, end (3) obs*rv: gonral
shipboerd uxp rimcntal sct-up.

5.2.2 After ¢ survey of tost craft has bi:cn madc on R # 1 day,
a proj-ct 6.4 recovcry tcam will dismount tcst nencls ind mov; thom to
th dccontaminction sitc. From R dzy to R plus scven, pancls cnd racks

will be processed ct dsconteminution station.
5.3 Betreon-Shot Prepsrution Schedule

5.3.1 aftr dcecontcminetion, the pan ls wili b replace d by eclccn

on.s from the storage area.

to th

framcs end recks.

Strippcbl: cocting will oncc cgiin b. cpplicd

Reeks will be mount:d on th: ships ind the

pr: p.roation will continuc as indic:tcd in S-ction 5.2.1,

53.2 Aft-r docontcminction tests, any contaminent romorining on
p.nls, fram-s or racks will be removed by r-p :tcd applicctions of methods
list'd inTcbd-l. If the deconteminetion arc: shovs « radiation beckground
thet will interfor: with future t-sting, then arce dccont-mination will be
institut<d.

53.3 Detection instrum nts will tb rcturncd to Projcct 6.4 for

ch. cking and cclibrntion. Decontcminabilitycgcnts and fresh wetcr supplics
at decontaminction ecntcr rill be replenished ,

5-34 Rch-arsels for subscquent shots vill bo sam as given in

S ction 5.2. Any modifications of tcchnicu s indiceted by xp ricnee of
first shot will be incorvorst-d in subscqucnt rch cors«ls.

5.4 Rollup Schedule

Br ars mE

Rollup sehedule vill be synchronized

D.teils of op rations cro given in Tub J-10.

6

“ith tht of Proj.ct 6.4.

Fd

JYO