3. TsSKS shD PLAN OF ATTACK C-D characteristics will be dctermin.d by making b tz snd gemme m asurumnts on cach petcl wforc and aft.r decontaminetion. All mecsurc- m nts will b medc aft.r pancls have bo:n transfcrr'd to the lend arvea where th. dccontaminction cquipment is sct up. Beta ond gammn rcadings rill bo mado in idcntical positions on test pancls so thst decontamination cff-ctivencss masuroements of th. two instrum nts can be compered. of opcretions on pancls is given in Tab J-1l. 4. Scqucenec ADMINISTRATIVE, «ND LOGISTICAL MATTERS 4.1 Pre-Tost Nork at army Chcmical Contor Zell Solect repr scntetive construction materials and écsign pencls to housc met«rials, Mat«riels arc given in Tab I-2; pancls end racks erc shorm in Teb J-3. About 3 manewocks aro requircd for this vork. Complction dat:. 1 Junc 1953. 4.1.2 Sclect eppropriatc prot: ctive coatings for construction meterials. Protcctive coatings arc indicet:d in Tab J-2. about 1 man-r ck is requirsd. 4.2 Complction detec 1 Junc 1953, Prco-Tcst Work on Trensit Abl: and Bekor 4.2.1 Inspect Transit Able and Bakcr to dot: rmin pencil and fellout cquipment locctions. sLocetions arc shown in Teb J-4. 6.2.2 Fabricetc pencls and recks and install on shipboard. about 100 man-woks of shop effort required. Complction datc for this vork is 1 Nov 1953. 4.2.3 Apply protictive coatings to pencls and paint francs. About 1 maneveck of -ffort requircd., Completion detc is 1 Dee 1953, 4.3 Post-Tcst Work et Army Chcmical Contor ST, LOViS ri. 43. Date on C-D propcrtics will be collcetcd znd anclyzcd, From th: rcsults of thc analysis, ea final report will be rrittin. Tho finzl rcport should be completcd within thr-« months aftcr personnel roturn to Acc. S37