3.

TsSKS shD PLAN OF ATTACK
C-D characteristics will be dctermin.d by making b tz snd gemme

m asurumnts on cach petcl wforc and aft.r decontaminetion.

All mecsurc-

m nts will b medc aft.r pancls have bo:n transfcrr'd to the lend arvea
where th. dccontaminction cquipment is sct up. Beta ond gammn rcadings

rill bo mado in idcntical positions on test pancls so thst decontamination

cff-ctivencss masuroements of th. two instrum nts can be compered.
of opcretions on pancls is given in Tab J-1l.
4.

Scqucenec

ADMINISTRATIVE, «ND LOGISTICAL MATTERS
4.1

Pre-Tost Nork at army Chcmical Contor
Zell

Solect repr scntetive construction materials and écsign

pencls to housc met«rials, Mat«riels arc given in Tab I-2; pancls end
racks erc shorm in Teb J-3. About 3 manewocks aro requircd for this vork.

Complction dat:. 1 Junc 1953.

4.1.2 Sclect eppropriatc prot: ctive coatings for construction
meterials. Protcctive coatings arc indicet:d in Tab J-2. about 1 man-r ck
is requirsd.

4.2

Complction detec 1 Junc 1953,

Prco-Tcst Work on Trensit Abl: and Bekor

4.2.1 Inspect Transit Able and Bakcr to dot: rmin pencil and fellout cquipment locctions. sLocetions arc shown in Teb J-4.
6.2.2 Fabricetc pencls and recks and install on shipboard.
about 100 man-woks of shop effort required. Complction datc for this
vork is 1 Nov 1953.
4.2.3 Apply protictive coatings to pencls and paint francs.
About 1 maneveck of -ffort requircd., Completion detc is 1 Dee 1953,

4.3

Post-Tcst Work et Army Chcmical Contor

ST, LOViS ri.

43. Date on C-D propcrtics will be collcetcd znd anclyzcd,

From th: rcsults of thc analysis, ea final report will be rrittin. Tho
finzl rcport should be completcd within thr-« months aftcr personnel
roturn to Acc.