1.5

Fricndly Fore:s

1.5.1

Scmas basic plan.

1.5.2 Removal of tcst pencls from dronc ships cft.r contamin:ting «vent will b carricd out with the aid of Project 6.4.
1.5.3

Transfer of tost panols to and from th: beach dccontaminctior

1.5.4

P.rsonncl from 6.5 will cid Project 6.4 in op retionczl ship-

erea will b: dom by J6, Task Group 7.1.

board dcconteminction end ventilation studics.

1.6 Assumptions and Linitctions
1.6.1

Scmc as in besic plen.

1.6.2 Contcminction of the woeether surfiec > of lind installations
and ships may present c scverc hazard to personncl peywnd th rong of

sewre physical damtgc.
1.6.3

Surfaces to be test-d are ropresontative of those found on

lind instelletions and ships.

1.6.4 Mi thods of dcconteminction «arc ropriscntctive. of those thet
con be uscd on land instcllctions and ships.
1.6.5

Th typ: contaminant is represcntctive of som typc thet

mey b. found on lind instclletions and shivs, but is not r-pr sontctiv of
th. contaminant exp ctcd in c harbor explosion.
2-

MISSION
2.1

To obtain information noecssary to dcterminc the contaminction

cherect«ristics of various constructio:. matcrials.

2.2 To obtcin informetion neecssary to dctcrmin the decontaminction

ch.rcctcristics of various construction metcriels,
2.3

To chick uscfulncss of ta instrumnts for m-«suring dcecontomi-

24

To

nation cffcctivcnuss.
coatings,

ST. LOUIE FRC

(V

vealuatc the contanincbility-docontaminability pt tc etive

/36