LIST OF TABS
TAB Wo.
I-]

Paragraph Reference

Selel;

423

4.6

Tad Contents

Detailed location of instruments

aboard Able and Baker.

Seled3

4402

Preliminary report information.

Belek

Data coordination with other programs, gamma background vs. time, etc.

4.1

Similated test runs at USNRIL.

4.4.1

Post test instrument design review.

4.5

Equipment list.

4.7

Supporting services at site.

4.8

Manpower requirements.

4.9

Shipping and transportation require-

ments to and from site.

4.10

Costs; breakdown of bucget and

Sel; 5.4

Pre-shot preparation schedule.

6023 565

Dry run and shot schedules.

565

Roll-up schedule.

record of expenditures.

ST. LOUIS FRC

J3Y

Select target paragraph3