4.10 Costs

See Tab I-10

5.

CO:LiAND AND COLRTUNICATICNS MATTERS

(Test Operations)

See Basic Plan.

5el

Pre-Shot Preparation

See Teb I-11 for details and schedule. Instruments aboard Able
and Baker will be given a final calibration and operational test at test
site.

5.2

Dry Runs and Shot Rehearsals
See Tab I-12 for details and schedule.

50d

Typical Shot Schedule
5.3.1

See Tab I-12

Operations Prior to H-Hour
Final check of instruments; turn switches one

5.3.2

Operations Between HW and R Hour
None

_ 5.3.3

50%

Operations After R~Hour
5305.1

Recovery of Data

5-3.3,2

Preliminary processing of data.

5.3.3.3

Dissemination of preliminary data.

Between Shot Preparation

See Tab I-11.

Instruments to be given operational tests,

"reloaded" with filter and graph paper, and recalibrated.
50d

Roll-Up Schedule
See basic plan and Tab I-15 for schedule,
5e5el

Packing

ST. LOu:S FRC

When all decontanination is completed, equipment and

tools will be made ready for shipment.

Select target paragraph3