4.3 Post-Test Work on Transit Able and Baker See rollup. 4.4 Post-Test Work at USNRDL 4.4.1 Post-Test Experimental Work Instrument design will be reviewed, and further tests will be made if needed to improve and complete the final instrument model. 4.4.2 Data Reduction Preliminary airborne beta concentration information will be divulged at test site. 4.4.3 tabs. Completed reduction will take place at USNRDL. Report Writing This annex will be kept current by means of supplementary Preliminary report will be written in the field. to be written on return to USINRDL. 4.5 Final report is Equipment Requirements Consists of spare and replacement parts and tools necessary to maintain and repair instruments aboard Able and Baker. 4.6 Instrument Requirements A shipboard air monitor, Esterline-Angus recorder and a Solavolt voltage regulator will be located aboard each ship. 4.7 Supporting Services Required at Site See Tab I-7 4.8 4.7.1 Office and storage space. 4.7.2 Shop facilities end work area. 4.7.3 Ifisc. services (utilities, transportation, etc.) Manpower Requirements See Tab I-8 4.9 ST. LOUIS rn Shipping and Transportation Requirements Sea and air shipment requirements for materials and persomnel to and from test area are shovm in tab I-9. /3/