£.10

Costs

See Tab H5.
5.

COMMAND AND COMJUNICATIOUS MATTERS (Test Operations)

General operational matters are as given in the basic plan.
is shot time. R-hour is reboarding time on a particular ship.
5el

d-hour

Pre-Shot Preparation.
None

5e2

Dry Runs and Shot Rehearsals
None

5

Typical Shot Schedules
5e3el1

Operations Prior to H-Hour
None

5.3.22

Operations Between H and R-Hour
Sedeleol

Contact 6.4 a, d, f, and g and complete arrange-

ments for instruments and services.

50363

Operations After R-Hour
Retrieve dosimeters.

5.4

Proceed with monitoring.

Between Shot Preparation

Install dosimeters as late as possible to minimize dosage from
residual contamination.
565

Roll-up Schedule

525.1 All records and classified material will be cleared
through the appropriate channels and prepared for transmittal to USNRDL.
5.6

Communications and Timing Links
As in basic plan.

5.7?

No special requirements not covered by Annex F.

Report Schedule

ST, LOUIS FEC
a be

The final report shovld be completed within six months after

personnel return to USNRDL.

6

|

Jo 7

Select target paragraph3