4.2

Pre-Test Work on Transit Able and Baker at USWRDL

None
4.3

Post-Test Work on Transit Able and Baker
None

44

Post-Test Work at USNRDL

4.4.1

Post-Test Experimental Work
None

4.4.2

Data Reduction
The data obtained from the gamma recording instruments

will be presented as a log-log plot by Project 6.4f.
will be reduced at test site.

4.4.5
to this annex.

information.
4.5

Some of the data

Report Writing
Report information will be ke pt current by means of tabs
Preliminary report will be written in field from this

Final report will be written upon return to USNRDL.

Equipment Requirements
None

4.6

Instrument Requirements

4.6.1 See Tad Hl for details of location and instrument requirements for ionization chambers with continuous recorders.
4.6.2 See Tab Hl for details of location and instrument requirements for integrating dosimeters.

4.6.53
4.7

See Tab H2 for details of radiation field surveys.

SupvortingServices Required at Site
see Tab H4.

4.8

Mannower Requirements

ST, LOUIS FRC

See Tab H5.
4.9

Shipping and Transvortatioh Requirements
None.
5

i
.

y

S26