ey the ships, «all personnel boerding or leeving the ship will be checked by Project 6.4g personnel. FPersonnei plenning to bonri the ship rill be checkee for adequate protective clothinz, dosimetry devices anc validity of work area assignment. Pursonncel leaving the shi, rill be checked for contaninetion. Preliminary decontamination, such as renovel of certain erticles of contamineted clothing, may be requirec nrior to release of perscnnel for processing throuzh the personnel deconterination facility on Elmcr. Detsiled procedures of these operations are outlined in Tab G-5, as the test opcretion prograsscs and the shle Ship is used as a work station for the Beker shir, the secomlary control station will be moved from the tug tc the sable Shir. «area delincations will be made ts control the flow of trceffic an? a responsible representative of Project 6.4g¢ will be availcble at all times to hendle ony emergency Rad Safe situation that might occur during the decontamination oporstions on board the shirs. Specific operctional nlans will be made the night before each vorkday to enable Project 6.4g¢ personnel to provide edequatc coverage for the scheduled test operetions on board the shins. Snccific attention sheuld be raid to errengoments for removing any instruments, equirment or semples fron the test ships in orccr to facilitate contemination control. Proner errenzencents for messinz will also have to be made in accordance rith the Caily operation plan, 5.4 Betveoen Shot Prenaration &t the conclusion cf Project 6,4 operstioh, all reciclogiccl sefety cquirmcnt and instruzcnts rill be checked anc rercired cs necessery. The personnel decontaminction facility will be carefully checked for nossible unknown contarination and reatiec for the next phase of the test opcration. Stocks will be renlenishcd an] nodificetion to procedurcs will be made in accornance with the experience gained during the provisrus operation. Radio- logicel survey techniques and cosimetry operations will be reviewed and Louified as ceemed arviscble,. 5.5 Roll-Up Schcdule (Sco basic vlan and Tab G-15 for schedule). 5.5 5.1 Packing ing oo ST, LOUIS FRC When cll test operations ere completed, the equin- ment an? instruments will be cleaned an2 repaired as necessary end packed for stowage or shipment. 12 /19