5.1 Pre-Shot Prenaretion (Seo Tab G-13 for details and sche“ulc).
5.1.1 Qn-Site Equinment Check and Instrument Calibreti-n
Tc assurc thet all radiological safety equinmcnt an! instrumentation are ready for use, it will be neccessary to check these itens end
calitretc the instrumentetion in accordance with the radiation field to be

reasured.

(Sve Tab G-6).

5.1.2 Formalization of Pcrsonnel Dosimotry Operations
In vicw of the magnitude and importnrnce of this operation,

it will be necessary to check cut the film proccssing and rccord keuping
systens in ordcr to be ccrtain thet a minimum of confusion will result

when the actual test opcrations begin.
5.1.3

(Sco Tab G-4).

Inszncction end Readiness ofPcrsonnol Decontanination Facility

eee:

It will be necessrry to properly stow -,d arrange for the

issue end return of the various items of protcctive equipment srior to the

test opcrntions.
5.1.4

(Sce Tab G-5).

Establish rclations with TU-7

Duc. to the close interaecticn betreen Project 6.4¢ operations
eni TU-7, it will be neecssary to formalize the ficld contecting proccdures

to minimize confusion and misuncersteanding.
5.2

(Seu Tab G-2).

Dry Runs and Shot Rehearsals (Svc Tab G-13 for schedule).
5.2.1

Trainin» and Indoctrination of Pzrsonnel

Final end detailed training of Project 6.4 personnel in the
rnrdiological safety aspects of thcir particular opcration will be ecnducted

euring tho dry runs and shot rehearsals.
5.2.2

(Soc Tab G-7).

Formalize Rodiological Monitoring Survey Techniques.
During tho dry runs and shot rehcarsels, Project 6.4g

personnel will formalize the opcrational details of the various radiolegical

nonitoring surveys and the intcraction with othor Project 6.4 personnel,

(Scc Teb G-3).

5.2.3

Pcrsonncl Dosimetry Operetions

ST. LO wo Hw

To mininize confusion of expos:re records, dry runs will be

nace on the issue, collection, processing and recording of dosimetry
A@cvices and dosages during the dry runs and shot rehearsals,
(Sce Tab G-§

9

/Vb

Select target paragraph3