4.2

Pre-Tost York on Transit »ble ond Bakor et YSNRDL

421 Training and Indoctrination of Personnol
The ten "special monitors" furnished Project 6.4g fron the

crews of tho Y4G's 39 and 40 will be given additionel specielizod

redinlogical sefety training in order to enable thom to carry out their

particul-r vart of Project 6.4's program.
4.2.2

(Soc Tab G-7).

Femiliarization and Preperation of Monitoring Mans
for Radiological Surveys

4s pert of the goncral indoctrinetion of Project 6.4¢
personnel, specific monitoring survey techniques end monitoring check
points will be established to facilitate anc expedite the rediological

survey operations of Project 6.4g.
4.3

(Sec Tab G-3).

Post-Tcst Hork on Transit able end Beker
4.3.1

Spccial Radiological Survoys

In order to determine when and hov the YaG's 39 and 40
ere to be returned to the states for additionel decontamination studies,

it will be necessary to makc a special radiological survey of cach test

ship at the conclusion of Operation Transit in ordcr to determine if any
radiological hazards are present that require special preceution to be

teken.

(&c Tab G-9).
4.3.2

Snccicol Radiological Safety Instructicns

On the besis of the radiological surveys mentioned in
43.1, it may be necessary to establish special rules and procedurcs for
the protection of the operating crews of the YG's 39 and 40 during the

return of tho test shins to the states. <dAdequate protcctive cquirment,
instruncntation and spocific rules and procedures will be nrovided to
assure the safcty of the operating crews. appropriate Project 6.4g personnel will be evailablo at all timcs to handle any snecial radiclogicel
safety problems that may arise during tho return voyage. (Se Tab G-9).

4.4 Post-Test Work et USNEDL
4.4.1

Post-Test Experimental Work
None
2

4e4e2 Data Reduction

385 3 ead

ST. LU

The serples collectcad using the eir samnling instruments

surplicd by Preject 6.4¢ will be processcd usinz Project 6.4c's data

processing equipnent and techniques. 411 pertinont radinlogical safety
deta, such as cosinctry records, protcctive equipment critiques, radiological survey informaticn, otc. will bo summarized and tabulated for
the finsl report.

7

Select target paragraph3