5.2.2.2
samples to USNRDL.
5.2.2.3

Preparations will be made to ship the recovered
Instruments in necd of extensive repair and

which previously have been removed from the ship will suffer maintenance.

5.2.3

Operations after R-hour
See Tab E-10.

5.3 Between Shop Preparation Schedule
5.3el

Maintenance and Repair

Instruments will be serviced and repaired as the necd
arises, If the repair facilities aboard ABLE and BAKER are not sufficient,
machine shop work will be done at Parry Island.
5.3.2

Operational Decontamination Requirements
5.3.2.1

The precipitator in condition IV must be washed

(washing system containcd within the precipitator), and the Farr filter

of condition V and the Chemical Corps filtcr of condition VI must be re-

placed.

If the mushroom heads of the ventilation system cannot be

adequately decontaminated, then they must be removed and stored until

just prior to the follovring shot.

5.3.2.2 Decontamination ef the ventilation ducts, ventilated compartments, fircroom and boiler air systems is described in Annex C.

523-3

Replenishment of Instruments

Instruments will not be replenished since there arc no
completc spare units. If an instrument is damagcd beyond normal rcpair,
then it will either be left in position not operating or it will be replaced by an instrument from another location on the ship depending on
the importance of the instrument from the standpoint of gathcring
information.

5.3.

Shot Rehearsal Operation

5.4 Roll-up Schedule and Report Schedule

OF. LOVIS

"T]

See gencral plan and peragraph 5.1.2.

FRE

The roll-up schedule and report schedule will be dotermined by

the Project Officer.

5.5

Communication and Timing Links
Sce Tab E~20.

n

ee

[00