.
abo~
32,000 lbe. eaoh and 20S 48-in ~ela weighing about 2,300
I
I
lbs.
eaoh.
3. The fOllmdW
~terial and equi-nt
till ~
cable station for oonstruotionof reel s*do,
req~~d
at t~
blooking, shoring, eto.,
with a SUpply of spikes and bolts for assembling the stands.
(a) Lumber
‘1
I
I
(A list Of SiZOS and amounts)
lift of eight tone for
● mlnim~
.
the handling of cable reels. This mane will be uead at leaet every
(b) One mobile o-e
with
often oontinue over 24
two hours during loading operation whioh my
hours. It is therefore ● primary requisite for the shore station.
It will also be neoessary fbr the unloadlng of cargo boats,when the
I
oable is plaoed ashore. It is suggested the following item or one
of similar design be supplied for this purpose:
Crane, remlving, truok,
mounted, pneunatio ~-engine
drive, 8 to 12 ton, Close XX, @
%ook No. 78-2831.000-000
(e) One Weapone Carrier (four wheel vartety suffloient)
should be assigned the cable station for general utility use.
(d) One radio equipped jeep (SCR-608) should be provided
both for utility use of the oable station and for reliable and readily
available oommunioationefor transportationto any of the @even uhore
ends of the cablea*
(e) *O
tool and 6upply6hOd (lighted)approxinwteiy 16’
4
by 3ot tith shelves and a ~rk
~rloh Should ~
b~lt ●t t~
able
I
I
I
I
I
I
I
atationo
(f) For oonetruotion of light rain-proof shelters:
22
Seation XI
I