..
1
as the lead BWOaU and the Bureau Of yard6 and Dooke assisting,
it is suggested that the plan propooed in en~loam
(B) be exeouted.
4. There will be a ooneidemble amount of highly specialized
subimafinecable spliaing Perfo-d
●
the operation site. It la ro-
questod that the inetruotiotito the Bureau of Ships inolude this
oable SpliOi% requirement,the general i~tructiom
on fioh are set
out in enolomre (C).
6.
The oablo ship muet be nnde ●-ilable at the operation cite
on or before 1 January1948.
6.
Cable and otlnr material met
be a-ilable for loading at
%rt Hueneme on or before 20 llovekber1947. Marking and shipping
inetruotion,=y
be obtained from =4ndA
(Hr. W. C. Dudlay, Code
IM-121).
7. The cost of this pro~eet will be ohargeablo to funds 8ade
●vailable to the Havy Department by the Atomlo Energy Commission,
detailed”inotructiomeof whioh uan be obtained from the Fisoal
Mreetor of the Bureau of $uppliee and &oounts
(CaptainW. W. Honaker,
SC, USN Code DF).
t
FOR LT. GIHWRAL HULL:
00:
BusMpll 440
BuSandA
------
------
------
/a/ Garlen R. B-t
Garlen R. Br@nt,
Lt. Col., AGD,
Ad$rhnt GO= ml
----0------
----
EIELOBURH “AW
CABLE IAYI?IGCHAR
1.
It i. proposed to uee an LSH for la@ng the oable ●ssisted
18
-
Section XI
~
-