ae b. KWAJALEIN I - Request CTG 7.3 provide vehicle support of Project 6.6 by authorizing the project's utilization of the existing Naval Station Motor Pool. c. ° WOTHO, KUSAIE and RONGELAP ~- Authorize the projects at these sites joint usage of vehicles provided to AwS/Rad-Safe installations. type of vehicle must be Truck, 3/4 ton, w/A-Frame, winch and pintile. 10. However, POWER REQUIREMENTS: a. KUSAIE - Projects 6.4 and 6.9 will share a 30 kw diesel generator b. WOTHO - Project 6.4 will be furnished a 20 kw diesel generator c. RONGELAP - Project 6.6 will be furnished a 20 kw diesel generator d. KWAJALEIN: which will be furnished by TU-3. by TU-3. by TU-3. Project 34.4 will be supported by the AWS/Rad-Safe installation. Project 34.4 will be supported by the AWS/Rad-Safe installation. (1) It is requested that CIG 7.3 arrange with CO, USNS, KWAJALEIN to furnish Project 34.4 with 4 kw 120 volt single phase power. (CJTF SEVEN Ltr J~4/400.346 of 6 Nov 1957, subject: "Project 34.4 Requirements" refers.) (2) Project 6.6 requires 15 kw 116 volt AC. It is requested that CJTF SEVEN determine if the tenant organization can furnish this power and advise this Task Group as soon aa practicable, TU-3 is prepared to furnish a 20 kw diesel generator in the event this requirement cannot be met locally, e. UTIRIK - Project 34.4 will be supported by the AWS/Red-Safe f. WAKE ~ Project 6.9 will require 15 kw 115v AC. installation, It is request- ed that CJTF SEVEN determine if this is available and advise TG 7.1 as scon as practicable. If not available, TU-3 will furnish a 20 kw diesel generator. In this event, the POL requirements will be 90 barrels of diesel fuel and 2 barrels of gasoline rather than the 50 gallons of motor gasoline per observa- tion day mentioned in para c of CJTF SEVEN Ltr J-4/300.6 dated 15 Oct 1957. It should be noted that POL will not be supplied from EPG, s 11. POL REQUIREMENTS: a. KUSAIB - Projects 6.4 and 6.9 will require 180 barrels of diesel fuel and 12 barrels of gasoline. 7.1 to TG 7.5 (H&N). b. WOTHO - Project 6.4 will require 90 barrels of diesel fuel and 2 barrels of gasoline. TG 7.5 (B&N). This requirement has been submitted by TG This requirement has been submitted by TG 7.1 to Setee L re eepeesi : eet ee -6- CLASSIFICATION We SEcLE3 PER DOC REVIEWJa, 1973 Z| 2 Ez, “a

Select target paragraph3