OPERATIONS PLAN

g.
h.

3.

Dump truck and 4 x 4 operational on Enewetak to load
equipment for transport to Enjebi on January 18.
12 12-volt batteries

(6 loaned from H&N Enewetak

6 shipped from Honolulu).

KU or LCM transportation from

Enewetak to Enjebi

and

(1

trip)

for vehicles, equipment and personnel January 18 and
return (1 trip) on January 31.
LCM (i trip) to Enjebi
February 1 and return February 14.

VII.

4.

Whaler or other boat support (occasional for resupply).

5.

Rad-safe - Request JTG-RCC permission for Party Chief to
carry out rad safe monitoring on Enjebi in same manner
performed by LLL Garden Program personnel,

6.

Other - It is highly desirable that there be no blasting or
burning during the period of this mission,

7.

DOE/DNA Representative Kwajalein

FUNDING

a.

Ship Whaler and engine to H&N/Enewetak c/o Clayton Mitsui
for arrival prior to January 10th.

b.
c.

Ship air compressor off LCU to Enewetak (same as above).
Ship inflatable boat and small motor as above.

LLL efforts are funded through a Request for Services (SANL) No. 609
issued by the University of California Lawrence Livermore Laboratory
under USDOE Prime Contract No. W-7405-48.
U of H Team #1 efforts are funded under DOE Contract EY-76-C-08-0703
while U of H Team #2 has its efforts funded under DOE Contract

EY-77-S-08-1529.
entities,

(Because of the overlapping of 3 separately funded

H&N/Enewetak must insure that charges incurred are

properly identified as to user so the proper program is assessed.)
Some of the readily identifiable charges are:
LLL -

a.

S&Q on Enewetak and food charges for Enjebi.

b.

3 55-drums 80 octane gas

(or mogas substitute)

U of dH,

Team #1- a.

Motor oil, hydraulic fluid.

U of H,

Team #2- a.

Whaler, compressor and battery shipment from Honolulu.

Other items such as water,

be pro-rated equitably.

diesel fuel,

transportation,

etc.

should

Select target paragraph3