as a result of the sediment deposited in the water and could be evaluated adequately using only
an AN/PDR-3§ survey type meter. The maximum contamination encountered in the lagoon
anchorages was 8.4x 107" microcurie per milliliter. The average activity varied from 1 x

107‘ to 3 x 1074 microcurie per milliliter. No ship’s drinking water was found to contain any

detectable radioactive material
Air samples collected in fall-out areas by vacuum type air filters and cascade-impaector
slides constituted another type of sample analyzed in the field laboratory. Upon those occasions

when fall-out was detected on board the USS Bairoko, portable air aamplers were periodically

turned on as a means to determine whether fall-out was still occurring. The entire filter paper

oa

|

oP Eh tees Fnelainecompet oe2 lillie aan. chat eT got Wi

.

weeps:

was counted and the activity was noted in counts/min per cu ft of air. Air samplers were also
used by the initial survey party. A cascade impactor, installed in the radiac repair shop on
board the Bairoko, was utilized to evaluate the inhalation harard associated with the radioactive particulate matter by determining the percentage of the total activity associated with

particles leas than 5 » in diameter. The air samples collected on March 1, when the USS

Bairoko recetved a substantial fall-outARndicated activities ranging from 455 to
2740 counts/min per cu ft of air. The only cascade-impactor data were also obtained during

the fall-out that occurred on the Batroko. An average of 65 per cent of the activity was found
to be associated with particles less than 5 p in diameter.

Decay-rate measurements and energy determinations were made on various types of
samples throughout the operation in an effort to obtain detailed information on the fundamental
properties of the radioactive particulate matter. Gamma energies were difficult to obtain ac- —
curately due to the low counting efficiency of G-M tubes for gamma radiation and the apparent
low energies involved. The latter also made beta-energy determinations more difficult. Gamma
energies measured on very active samples varied from 600 to 25 kev. The low gamma energies
measured were somewhat surprising. Beta energies varied from 0.2 to 2.2 Mev.
Log-log plots of counts per minute vs time after detonation were utilized to obtain decayrate data. Samples studied included fall-out samples on the Bairoko, water samples from the
lagoon and drinking-water samples from Rongelap, crater samples, and air samples, The following results represent a croas section of the different types of samples studied and the calculated slope of the line obtained by plotting the log of the activity vs the log of the timeafter
detonation,
1. Fall-out sample on the flight deck of the Bairoko
62.
2. Lagoon sample collected 1220 Apr. 7
-03 at +8 days and 1.31 at +25
days.
3. Air sample collected Apr. 26,
e six dr
-water samples from Rongelap indicated an average slope of ~1.48 from
4.2 days
10 days and a slope of —1.80 until last counted,
iscellaneous tasks assigned to the radiation-analysis section included the analysis of
urine samples for tritium content; examination of food, soil, and water samples obtained on a
resurvey mission to Rongelap and Uterik; a study of the decay characteristics of contaminating
material on vans being shipped to the United States; and analysis of water samples obtained
during a water survey following
4.6.10

Conclusions and Recommendations

- (a) Conclusions. The present maximum permissible exposure of 3.9 r per 13-week test
period is not a realistic MPE in consideration of heavy work loads in extensively contaminated
areas, Theuse of waivers to cover exposures in excess of this MPE becomes a needless routine without much significance when operations are conducted in large contamination areas
without much interval between detonations, A large number of individuals did exceed 3.9 r, but
very few exceeded 6.0 r.
The utilization of project personnel as monitors proved itself with few exceptions.
Procurement and clearance of personne] must be accomplished at least four months in
advance of operations in order that selection and training can be completed and In order that
the unit can be completely assembled prior to movement overseas.

72

BEST AVAILABLE Copy

Select target paragraph3