Order number 940330-160606-96 -001-001 page 33 set 11 with 111 of 111 items TITLE ENGLISH PERSONAL AUTHOR/AFFIL CORPORATE TEXT Mrstik, A.V. Massachusetts Lincoln Lab. Inst. of Tech., Lexington, . MA (USA). é 890000 PUB. DATE (YYMMDD) LIMITATION CODE ABSTRACT ‘ UNL The Kiernan Reentry Measurements System (KREMS), located on Kwajalein Atoll in the Pacific, is the United States’ most sophisticated and important research and development radar site. Consisting of four one-of-a-kind instrumentation radars, KREMS has played a major role for the past 25 years in the collection of data associated with ICBM testing. Furthermore, it has served as an important space-surveillance facility that provides an early U.S. view of many Soviet and Chinese satellite launches. Finally, the system is slated to play a key role in Strategic Defense Initiative experiments. RADAR/;MISSILES/test facilities ;BALLISTIC MISSILE DEFENSE/test facilities ;SATELLITES;DATA ACQUISITION; RADAR; REENTRY VEHICLES; SURVEILLANCE; MISSILES ; MARSHALL ISLANDS KEYWORDS EDB Item 45 PRIMARY REPORT NUMBER TITLE ENGLISH CORPORATE TEXT PUB. DATE (YYMMDD) LIMITATION CODE ABSTRACT Kiernan reentry measurements system on Kwajalein atoll Roth, K.R.; Austin, M.E.; Frediani, D.J.; Knittel, G.H.; AD-A--214139/8/XAB Proposed actions at US Army Kwajalein atoll. environmental impact statement (FEIS) Army Strategic Defense Command, Huntsville, 891000 Final AL (USA) UNL The purpose of the Proposed Action is to conduct tests and collect data in support of continuing research, development, and operational missions; operational space track missions; and Strategic Defense Initiative research, development, test, and evaluation activities. Three alternatives are considered in the Environmental Impact Statement (EIS). The No-Action Alternative - includes the ongoing activities at USAKA. The Proposed Action includes installation and testing of SDI sensing/tracking equipment and interceptor missile systems. Four construction projects in support of base operators are also included. Finally, the EIS examines a Change of Duration Alternative that implement as the Proposed Action over a longer period of time. The EIS examines the environmental impacts of each alternative. Where impacts were found to be potentially significant, mitigation measures are identified. Key topics addressed by the EIS I0038b1 include land and reef areas, water resources,

Select target paragraph3