~
\
i OPLAN
2. MISSION:
Conduct a full Case 3 Environmental Impact Statement
enn
approved Cleanup to accomplish those cleanup actions listed in Reference |
a.
Physical hazards will be removed from all islands.
b.
Obstructions to development of habitation and agriculture will
be removed.
Unsalvageable radioactive material will be disposed of in|
'
c.
accordance with appropriate procedures.
d.
Se
ne
Cc, para 5.5.3.2:
In general,_the ERDA guidelines provide for removal of concen-
trations ofPlutonium3in soil exceeding 400 pico curies per gram (pCi/g)9 |
a
for selective removal in the range of 40 to 400 pCi/g and for no manda~
ee = eee et rege te ee
tory action below 40 pci/g.
Woy
.
|
gesTAVAILABLE COPY
guidelines, however, are not sufficiently specific to facilitate detailed
operat ional planning - ERDA has agreed to provide more specific guidances
on the application of the basic Task Group recomendations and to. Pro- %
3
fa
vide greater specificity and operating criteria (see Tab E).
b.
The "Case 3 Cleamp” as described in Reference a conforms with 3 '
S——S
the Task Group Recommendations.
Thus, Cleamup is dependent upon radio~
contaminated, and the classification of soil according to it
oncen =
tration as either (1) greater than 400 pCi/g (mandatory cleanup), (2)
&
less than 40 pCi/g (no cleanup required), or (3) in the range of40_ 4
pci/g to 400 pci/g (individual case cleanup).
P