Pacific Cratering Experiment (PACE) personnel on the preliminary

findings of the AEC survey team. DNA/PACE decided to continue their
work on Runit in preparation for their high explosive excavation
experiments while the Scripps Institute personnel decided to leave
the Atoll. The AEC survey team advised the DNA/PACE personnel that
they did not consider PACE radiological precautions as adequate.
On returning to Kwajalein on May 20, Mr. Ray sent a message to Air
Force authorities recommending that Runit Island be quarantined.
This recommendation was based upon the fact that the road between the
dock and the PACE work areas passes directly through the highly contaminated area and that trucks and other earthmoving equipment were

transiting the contaminated areas and were being taken off Runit
Island to other islands. His recommendation indicated the need for
cessation of all operations and traffic to Runit Island until adequate
survey and decontamination procedures could be established to prevent
further aggravation through dispersion of contamination to other

islands and/or shipping facilities.

The analysis of several fragments collected by the AEC survey team is
now underway at LLL and should be available within the next week.

Other environmental samples collected by the team will require several

weeks for analysis.

The Micronesian visitors were not informed of this contamination

problem.

DNA has advised AEC that the PACE work on Runit has been discontinued
and the Island is under quarantine. General Carroll H. Dunn, Director,
DNA, has indicated to General Giller that their immediate plans are to
send a DNA radiological survey team to Runit Island, with appropriate
_ AEC technical assistance, to conduct a detailed survey of the PACE work
areas. The results of their survey will be used to determine the

feasibility of conducting the PACE experiment as planned, or with appro-

priate precautions or the necessity of selecting another site.

ORIGINAL SIGNED BY
MARTIN B. BILES

Martin B. Biles, Director

Division of Operational Safety

n
bec: General Manager (2)
7———-S-Maj, Gen. E. B. Giller, USAF, AGMMA

J. H. Rubin, AGMES
SECY (2)