from the army and Air Force was no longer necessary,
Three technicians
remained on duty in the electrical and refrigeration shops of the AEC
contractor,
During this period a total of 765 man hours, 90 equipment
hours, and 762 vehicle hours were furnished the AEC contractor in
assistance to his program,
During the reporting period, the Engineer Section super-
vised, assisted or accomplished the following:
a,
The processing cf 13 work orders which were sent to
AEC for their accomplishment.
b.
aA clean up of the POL Farm project.
c.
The wiring of metal prefabricated buildings.
d.
The coordination of 18 uncompleted army projects
and 31 old and new job requests by Air Force,
There were 38 major and minor construction projects
completed.
These included: repair to the sea wall, fishing pier, and
tents damaged from typhoon DORIS; fill and compaction of land reclaima~
tion at the trash disposal area; repairs to French doors at the Officer's
Club; painting of buildings, including 7 metal prefabricated buildings
erected by the Army; construction of generator sheds; construction of
a salvage yard; the adaptation of file cabinets for safety locks; the
repair of frame buildings; the construction of cement ramps; the construction of partitions and security fences.
A total of 6097 man hours
was expended on these prcejects,
BNA
& 180 fcet section of reinforced concrete wall, with
footings, was constructed at Duffy's Tavern patio.
High tides and
rough water seriously hindered placing forms in front of the old wall
28