9.
The mechanism by means of which we can fund Dr. Fabrikant (LBL)
per the court agreement with the Bikini peoples is not clear.
Will this be a separately negotiated contract, oy will it be
funded as a project through LBL?
Estimated cost...
..
..
+
. unknown and to be negotiated, but
perhaps in the $100 range
—_ |}
10.
The future of MPRL cannot be deferred much longer. $200K/year
probably is not adequate to cover basic maintenance; better
e eStimates have been requested.
Estimated cost .
..
1.
6
6
es
6
ee
ew
te
oe
te
ew
we
ew
we
Spain
ww
tw ew $20BKS
®
It is anticipated that additional detection and counting equipment may be
required. This is not yet clear, but if so, the estimated costs might be
about $50K.
Utah
1.
The Dose Assessment Advisory Group repeatedly returned to and
emphasized the need for independent verification of the modeling
efforts at NV.
EML and the Utah dosimetry efforts are two such
approaches. A third is available to us as a result of aerial
surveys coordinated by the National Uranium Resources Evaluation
program.
Cs-137 levels were recorded along with U, Ra, etc. by
Bendix under contract to the Grand Junction office. NVOO and EML
feel that a feasibility study would be worth funding and NVOO is
considering $20K toward that effort.
I wold be more comfortable
if the aerial studies (including aerial] analysis for "hot spots")
were conducted independent of but in coordination with the AV
office, similar to the soil sampling studies at EML.
Perhaps this
could be managed by EML and funded either through EML or
Headquarters. Regardless, any proposal should be reviewed by FML.
Estimated cost .......... . . « $20K for feasibility;
$20-40K for implementation