Table D-4. Cesium-137 radionuclide concentration summary of individual soil
profiles taken on Lomilik Island (B-4) in pCi/g dry weight.
Location

Date?

0-5 cm

Site
Site
Site
Site
Site
Site
Site
Site
Site
Site
Site
Site
Site
Site
Site
Site

781)
7811
781)
7811
7814
7811
7811
7811
7811
7811
7811
781)
7811
781)
7811
7811

7.838E-01
1.086E+00
1.672E+00
1.284E+00
1.389E+01
1.244E+00
1.393E+00
2.002E&+00
2.783E-01
1.153E+01
5.446E+00
1.828E+01
4.626E-01
1.907£+01
4.784E+01
6.983E+00

202
203
204
205
206
207
208
209
210
21}
212
213
214
215
216
217

5-10 cm

1.145E+00
8.770E-01
9.213E-01
1.204E+00
2.422E+00 ¥
1.387E+00
1.888E+00
2.301E+00
4.127E-01
8.622E+00
3.632E+00
1.099E+01
2.731E&+00
4.465E+00
3.478E+01
2.075E£+00

10-15 cm

15-25 cm

25-40 cm

40-60 cm

1.109E+00
1.039E+00
1.370E+00
1.436E+00
1.407E+00
1.368E+00
2.876E+00
1.666E€+00
4.427E-01
7.374E+00
1.604E+00
7.968E+00
3.841£+00
2.337E+00
1.420E+01
1.337E+00

1.285E+00
9.829E-01
1.479E+00
9.401E-01
1.049£&+00
1.613E+00
1.396£+00
5.925E€+00
5.423E-01
4.114E+00
1.065E+00
3.157E+00
3.017£+00
4.328E+00
2.484E+00
1.872E+00

1.472E+00
1.258E+00
1.707E+00
1.313E+00
1.592EF+00
1. 190E+00
1.860E+00
1.389E+00
1.415&+00
8.768E-01
1.322E+00
1.060E+00
1.623E+00 1.480E+00
usT>
NST
6.910E-61
1.492E+00
1.641E+00
7.270E-01
6.140E-01
4.779E-01
6.680E-01
4.752E-01
6.257E-01
4.626E-01
6.432E+00
2.350E+00
1.585E+00
1.203E+00
1.051E&+00
5.950E-01

NOTE: Specific activities are not decay corrected to 1987 but based on the date taken.
Sampling sites are shown in Fig. A-6.
4 The date is given by the last two digits of the year followed by the month,
November 1978.
> No sample taken.

e.g., 7811

is

Table D-5. Cesium-137 radionuclide concentration summary of individual soil
profiles taken on Aomen Island (B-5) in pCi/g dry weight.
Location

Date@

0-5 cm

5-10 cm

10-15 cm

15-25 cm

25-40 cm

40-60 cm

Site
Site
Site
Site
Site
Site
Site
Site
Site

7813
7811
781)
781)
7811
7811
7811
7811
787)

1.651E+00
1.093E-01
1.646£+00
4.820E-01
_ 9.734E+00
2.822E-01
3.044E+00
7.991E+00
2.987E+00

1.022E+00
1.965E-01
1.489E+00
4.649E-01
2.110E+00
5.734E-01
4.175E-01
5.824E+00
2.119E+00

1.789E+00
8.898E-01
1,.494E+00
1. 420£+00
4.604E-01
5.644E-01
1.269E-01
6.014E+00
4.554E+00

1 .580E+00
1.661E+00
2.870E+00
5.338E-01
1.417E-01
2.459E-01
8.752E-02
4.928E+00
9.509E-01

1.560E+00
1.090E+01
9.207E-01
1.277E+00
9 .826£-02
1.427E-01
5.428E-01
2.957E+00
7.694E+00

wsTb
1.861£&+00
NST
NST
9.905E-02
6.671E-02
2.903E-02
NST
2.297E+00

NOTE:

200
201
218
219
220
22]
222
223
224

Specific activities are not decay corrected to 1987 but based

on

the

Sampling sites are shown in Fig. A-7.
49 The date is given by the last two digits of the year followed by the month,
November 1978.
b No sample taken.

5000%80

0-4

date

taken.

e.g., 7811

is
,

Select target paragraph3