-13their tethered balloon systems which could be made ready on a relative short
time frame but a more reasonable approach would allow it to be done properly
in 6-8 months.
"H&N briefconference on the condition of Eniwetok and Bikini
in so far as they have been able to ascertain from visual inspection.
that Elmer buildings are in good shape.
may have to be replaced.
Electrical and mechanical installations
Overhead electrical
?
However, feeders will probably have to be replaced.
utilities
It appears
is unknown and will have to be checked.
distribution
appears good.
The state of underground
The big problem will be obtaining
a stock of equipment and material to support a test program.
H&N has a roster
containing 10,000 former employees and feels that manpower will not be too difficult
a problem.
Bikini would require extensive rehabilitation since, other than Nan
500 power plant, all other equipment, material, etc. have been removed to support
Nike~Zeus."
H&N will immediately begin working on the present drawings, preparing
lists of materials and equipment required and going through their personnel files
seeking the appropriate manpower.
They will prepare 2 schedules, one for the
crash 2 and 2 program and the other on resuming a standard program such as Hardtack
Phase I as rapidly as possible.
Cost estimates for FY 61 and 62 will be prepared
and H&N will be ready to discuss this all in more detail on the 26th.
A 25 Sept. TWX from Hertford to Betts documented these particular ideas for
atmospheric testing as well as pointing out the possibility of a "quick and
dirty" operation which could utilize a Task Force commanded by an Air Force
Commander “of suitable rank who could staff his organization at the Kirtland
location and logistical problems would be related only to military staging areas.
Liaison only with OFO would be necessary.''
Herein, Hertford recommended Major
General McCorkle for this particular role.