ATOMIC ENERGY COMMISSION

SANTA FE OPERATIONS OFFICE

a. sor

COMPLETION REPORT FOR

AS-BUILT DRAWING NUMBERS AND DATES:

.

2B-158
28-139

12/23/90
12/23/50

2B=428=3

12/23/50

28-330

12/23/90

Property

Account

JOB NO. 640 + ld

CONTRACT NO.

;
For:

AT—( 29-1 }-507

sweet wo.45 or_68

QT

“Not for usp by ae Page 108

LOCATION PARRY ISLAND ~- SITE "B"

DATE OF THIS REPORT:

23 December 1950

The Complete Construction of Sheet Metal Shop
Bullding No.:

316
ESTIMATE

DESCRIPTION OF PROPERTY UNITS

Quantity

Unit

1

Each

Construction

Contract

Est'd.

Value

Coeteeta ned

Engineering

Cost

Total

$275.74

$17,940.50

SHEET METAL SHOP
One story alusime construction; rectangular shape; size I.D. 24'-O" x 60'-8 1/2"
% 12'=O"; set on 5" thick concrete slab; double roof, separated by 2" x 4” redwood; vented window panels; aluminum partitions; with light and power services;

telephone installation; plumbing floor area 0.D. 1,557 square feet; cubic content
I.D. 14,569 cubic feet; three sliding doors; benches, rack and shelving; concrete
entrance pads - three 3'-6" x G'-0", one 3'-6" x 5'-0", total 102 square feet.

Installed equipment includes: Two drills, one grinder, one squares shear, two
metal brakes, one comb. bench machine, one setting down machine, one rotary
machine, on# slip roll machine, one solder furnace, one hand bending brake, one

petal hand shear, and one water cooler with drinking fountain.

Direct
Indirect

$13,513.16
k,151.60

“Proration of

Charges to Units

Select target paragraph3