COMPLETION REPORT FOR

AG-HILL P ORAWING NUMBERS ANG DATES:

2506

.

ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

* |

reat

ua

Mee5

ae

30-088

17@-817

JOB NO.
Ye

a

Account

CONTRACT NO,
For:

The Complete

_

_..

a

Construction of

!O2 ofr.

“Not for use by A-E

LOCATION EMIWETOK ATOLL

DATE OF THIS REPORT:

9 March 1951

Wing Models

.

Station Woe $2)

.

DESCRIPTION OF PROPERTY UNITS

Number

_AT-(29-1)-507_

Building No.:

H25heh 3/9/54
“Property |

82 - 10

sneet no,

'

_

Quantity

Unit

L

Each

ESTIMATE

a

_

Construction

Cont ract
Cost

Est'd,

Value

Gov. Furnished]
Material

.

,

Engineering
Cost

Tota.

|
AMC REQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:
WING MODELS, STATION $62, SITE “P*
Aocurately located reinforced concrete foundations as follows:
| and B, ona each 1,'-0" wide x 10'-0" x 1'-O" thick with two 1),'-0" long steel
Bolted horigontally to each.
Concrete Total - 10.4 cue yds.

Ba and Bc one each 10'-O" x 16'-0" x 2'-6* thick with two 16'~0" lonug steel columns
balted horisontally to each.
Concrete Total - 27.6 ou. yds.

;

B, one 7'-O0" x 14'-0" x 2'-0" thick with threaded J bolts protruding, two deadmen,
concrete, with 3/L" diameter protruding J bolts, sise each 3'-O" x 3'-8" x 3'-0",
On@ on each side and steal junction box with undergroum conduit.
Concrete Total ~ 9.3 cu. yde.
B,

ona 6'=0" x 9'-OF x 1'=0" thick with two 9'-0" long steel columna bolted

birdsontally and steel junction box with underground conduit.
Concrete Total - 2 cue yds.

Direct

Indirect

$13,072.89

8,823.28

$197.39

$22,093.%

*

.

Eroration of

harges to Units

Select target paragraph3