ATOMIC ENERGY COMMISSION

sEe

SANTK “PE “OPERATIONS OFFICE

SFO. 43a
(3.50)

COMPLETION REPORT FOR
Aa td | Ce AWITNG, NLIMeGE >

BH-250.4
3/9/51
3H-251.4 3/9/51
eat

Br

ud at

JOH NO,

30-088 3/9/51
3/9/51

8.2 - 10

17-617

(CONTRACT

For:

——

a

a

:

—_

ee

1ON ENIWETOK ATOLL

“Not

tor

DATE

of

oo

yO

Quantity
ef

TV eonst bo " on

unit
}

Contract
oo

use by

of
A-F

THIS REPORT:

9 March 1951

ESTIMATE.

fe

ns

OLSPRIPTION OF FROFERTY UNITS
:

|

Station No. 822

Building No.:

ua

ee
Accusynt
Number

AT-(29-1)-50?

The Complete tonstruction of Wing Models

BH-254.4 3/9/51
vert ’

NO.

SHEET WO. 109

Feattd.

Gov.

Value

Furaished

Material
Po

Engineering
Lost
j———-— -

*"Proration of

Cnarges to Units
fe

AMC ROYUIRED CONSTRUCTION AND LOCATIUN OF TH FOLLOWING STATIONS:
|

WING MODKLS,

STATION

#622,

SITE "S*"

Accurately located reinforced concrete foundations as follows:
B, and By one each 1h'-0" wide x 12'-~O" x 3'~O0" thick with two 1)'-0" long steel
columns bolted horizontally to each.
Concrete Total - 37-4 cue yds.

|

|
|

"

|
|

By and Bo one each 10'-O* x 16'-0" x 4'-0" thick with two 16'-0" long steel columns

bolted horizontally to each.

Concrete Total - 7.4 cu. yds.

one 10'-0" x 14'-O" x 3'-0" thick with threaded J bolte protruding, two dead~
edn: concrete, with 3/" diameter protruding J bolts, size each 3'-8" x 3'-8" x
3'=0", on# on each side and steel junction box with underground.

Concrete Total - 17.6 cu. ya.

By,

one 6'=0" x 12'-0" x 2'-O" thick with two 11'-0" long steel columns bolted

horizongbally and steel junction box with underground conduit.
Concrete Total - 4.9 ou. ydas

1

Rach

Direct
Indirect

$15,12).24
10,3588

$242.37

$25,721.49

CAUTION
a

Pe

inforftaatina ofieeting
United Qyates. Lee
pute of ite contents

vUhrieed pereun ts

Kh ln severe criminal
b Petree! Law *

Select target paragraph3